Owner & Location:
U.S. Army Corp of Engineers, Albuquerque District | Abiquiu Dam, NM
Project Completion Date:
June 2018
Owner & Location:
U.S. Army Corp of Engineers, Albuquerque District | Abiquiu Dam, NM
Project Completion Date:
June 2018
Owner & Location:
U.S. Army Corp of Engineers, Omaha District | Cheyenne Mountain Air Force Station, CO
Project Completion Date:
2016
Project Completion
(Estimated) June 2018
Owner & Location
General Services Administration | Denver Federal Center, Lakewood, CO
Project Completion:
January 2016
Due to roof leakage, Sky Blue Builders was contracted to repair and install new energy efficient roofing systems on 10 buildings within Schriever AFB. New assemblies consisted of rigid insulation and a TPO fully adhered membrane. In addition, several of the buildings were located within the Restricted Area.
Project Completion:
April 2015
Owner & Location:
U.S. Army Corp of Engineers, Omaha District | Fort Carson, CO
Project Completion Date:
2015
Complex Design-Build project for NPS included the removal of existing temporary fencing and the design and installation of new guide trails, and repair of the rock trap. The first scope of work – the guide walls – consists of the installation of natural rock walls, rock posts and/or steel pole and wire chain rails along various portions of the 1.5 mile trail leading up to the cave. The second scope – the rock trap – consists of repairing three steel doors that are used to hold and release debris from the trap, and replacement of chain link fence and rock trap curtain to divert and guide debris to the rock trap doors.
Owner & Location:
National Park Service | Timpanogos Cave, Utah
Project Completion Date:
2015
IDIQ Multiple Award Task Order Contract for Construction at the NIST, Boulder & Ft Collins sites. With 30 buildings and over 650,000 square feet of space task orders will consist of demolition, site work, electrical, mechanical, roofing, fire protection, and renovations of scientific research and laboratory facilities and administrative facilities.
Owner & Location:
National Institute of Standards & Technology | Boulder & Ft Collins, CO
Project Completion Date:
Estimated June 2015
IDIQ Contract to provide paving related activities and structure including roadways, bridges, sidewalks, parking areas, ditches trails and airfields at Fort Carson Army Installation, Pinion Canyon Maneuver Site, Pueblo Chemical Depot, United States Air Force Academy, Cheyenne Mountain Air Station, Peterson, Buckley, and Schriever Air Force Bases along the Colorado Front Range.
Owner & Location:
Front Range Military Installations | Colorado Springs & Denver, CO
Contract Completion Date:
June 2015
The STM RSF A Wing West Parking Area project consists of design and construction to enhance safety for the pedestrians and occupants of RSF as well as to improve emergency vehicle access. This project will define about seven new vehicle parking spots by repurposing some landscape/plaza areas to allow defined vehicular parking areas that will be able to resolve or reduce the current traffic flow and parking issues.
Owner & Location:
NREL | Golden, CO
Project Completion Date:
April 2015
Reconditioning of the existing ditches and the Mesa Access Road due to damage incurred during 2013 flooding. Sky Blue Builders provided a value engineering option to NIST which saved the government $17,000.
Owner & Location:
National Institute of Standards & Technology | Boulder, CO
Project Completion Date:
March 2014
This 4-year, $3.75M contract is for all tenant improvement projects under $150K at the Denver Federal Center. Sky Blue Builders currently has a full-time superintendent, project manager, and field personnel (6 carpenters/laborers, 2 electricians) to complete a variety of work from installing new drop outlets and carpet replacement to complete office remodels and major security system upgrades.
Owner & Location:
General Services Administration | Denver Federal Center, Lakewood, CO
Project Completion Date:
4 Year Contract
Owner & Location:
U.S. Fish & Wildlife Service | BACA National Wildlife Refuge, Crestone, CO
Project Completion Date:
March 2015
Construction of a new parking lot and innovative drainage system to mitigate seepage from the lot into the Cave. Work included removal and replacement of the existing parking lot, construction of a storm water collection system, construction of a storm water treatment system, removal & replacement of handicap accessible ramps from the parking lot to the visitor center, replacement of the ticket sales kiosk and rehabilitation of the existing storm water discharge channel.
Owner & Location:
National Park Service | Custer, South Dakota
Project Completion Date:
January 2015
Road and parking lot repairs by full replacement, including demolition and striping.
Owner & Location:
United Sates Air Force Academy | Colorado Springs, CO
Project Completion Date:
October 2014
This project for the National Institute of Standards and Technology (NIST) in Boulder consisted of an upgrade and remodel of the cafeteria located in Building 1. The work included demolition of the outdated kitchen/cafeteria space as well as preparation for installation of all new kitchen equipment. The cafeteria space is located within an occupied building on the NIST campus.
Owner & Location:
National Institute of Standards & Technology | Boulder, CO
Project Completion Date:
March 2014