Federal

FORT CARSON – REPAIR BUILDING 330

,

Design and construction of a new fire sprinkler system at Building 330. The intent of the system is to bring the newly installed storage racks into code compliance with new fire suppression and safety system. Work also includes repair and replacement of various damaged or deficient doors to improve the thermal envelope of the building.

Owner & Location:
U.S. Army Corp of Engineers, Omaha District | Fort Carson, CO

Project Completion Date:
2015

TIMPANOGOS CAVE ROCK WALL & ROCK TRAP

,

Complex Design-Build project for NPS included the removal of existing temporary fencing and the design and installation of new guide trails, and repair of the rock trap. The first scope of work – the guide walls – consists of the installation of natural rock walls, rock posts and/or steel pole and wire chain rails along various portions of the 1.5 mile trail leading up to the cave. The second scope – the rock trap – consists of repairing three steel doors that are used to hold and release debris from the trap, and replacement of chain link fence and rock trap curtain to divert and guide debris to the rock trap doors.

Owner & Location:
National Park Service | Timpanogos Cave, Utah

Project Completion Date:
2015

MINOR CONSTRUCTION IDIQ

,

IDIQ Multiple Award Task Order Contract for Construction at the NIST, Boulder & Ft Collins sites. With 30 buildings and over 650,000 square feet of space task orders will consist of demolition, site work, electrical, mechanical, roofing, fire protection, and renovations of scientific research and laboratory facilities and administrative facilities.

Owner & Location:
National Institute of Standards & Technology | Boulder & Ft Collins, CO

Project Completion Date:
Estimated June 2015

JOINT FORCES PAVING MATOC

,

IDIQ Contract to provide paving related activities and structure including roadways, bridges, sidewalks, parking areas, ditches trails and airfields at Fort Carson Army Installation, Pinion Canyon Maneuver Site, Pueblo Chemical Depot, United States Air Force Academy, Cheyenne Mountain Air Station, Peterson, Buckley, and Schriever Air Force Bases along the Colorado Front Range.

Owner & Location:
Front Range Military Installations | Colorado Springs & Denver, CO

Project Completion Date:
June 2015

STM RSF A WING WEST PARKING AREA

,

The STM RSF A Wing West Parking Area project consists of design and construction to enhance safety for the pedestrians and occupants of RSF as well as to improve emergency vehicle access. This project will define about seven new vehicle parking spots by repurposing some landscape/plaza areas to allow defined vehicular parking areas that will be able to resolve or reduce the current traffic flow and parking issues.

Owner & Location:
NREL | Golden, CO

Project Completion Date:
April 2015

NORTH PARKING LOT DRAINAGE UPGRADE

,

Site work consists of upgrading the existing drainage for the north parking lot of building 1 at the National Institute of Standards and Technology.

Owner & Location:
National Institute of Standards & Technology | Boulder, CO

Project Completion Date:
March 2015

DFC IDIQ

,

This 4-year, $3.75M contract is for all tenant improvement projects under $150K at the Denver Federal Center. Sky Blue Builders currently has a full-time superintendent, project manager, and field personnel (6 carpenters/laborers, 2 electricians) to complete a variety of work from installing new drop outlets and carpet replacement to complete office remodels and major security system upgrades.

Owner & Location:
General Services Administration | Denver Federal Center, Lakewood, CO

Project Completion Date:
4 Year Contract

BACA NATIONAL WILDLIFE REFUGE

,

Design-Build project consisted of the construction of a new 3,288SF office building and associated site utilities at the BACA National Wildlife Refuge in Crestone, Colorado.

Owner & Location:
U.S. Fish & Wildlife Service | BACA National Wildlife Refuge, Crestone, CO

Project Completion Date:
March 2015

JEWEL CAVE REPAIR PARKING LOT AND DRAINAGE SYSTEM

,

Construction of a new parking lot and innovative drainage system to mitigate seepage from the lot into the Cave. Work included removal and replacement of the existing parking lot, construction of a storm water collection system, construction of a storm water treatment system, removal & replacement of handicap accessible ramps from the parking lot to the visitor center, replacement of the ticket sales kiosk and rehabilitation of the existing storm water discharge channel.

Owner & Location:
National Park Service | Custer, South Dakota

Project Completion Date:
January 2015

REPAIR ROADS AND PARKING AT CATHEDRAL DRIVE

,

Road and parking lot repairs by full replacement, including demolition and striping.

Owner & Location:
United Sates Air Force Academy | Colorado Springs, CO

Project Completion Date:
October 2014

BUILDING 1 CAFETERIA REMODEL

,

This project for the National Institute of Standards and Technology (NIST) in Boulder consisted of an upgrade and remodel of the cafeteria located in Building 1. The work included demolition of the outdated kitchen/cafeteria space as well as preparation for installation of all new kitchen equipment. The cafeteria space is located within an occupied building on the NIST campus.

Owner & Location:
National Institute of Standards & Technology | Boulder, CO

Project Completion Date:
March 2014

ROCKY MOUNTAIN ARSENAL EMERGENCY ROAD AND ROOF REPAIR

,

This project for the U.S. Fish & Wildlife Service at the Rocky Mountain Arsenal National Wildlife Refuge included road, drainage and roof repairs. This emergency work was needed to repair damage that was caused by flooding that occurred during the week of September 8, 2013.

Owner & Location:
U.S. Fish & Wildlife Service | Rocky Mountain Arsenal National Wildlife Refuge, CO

Project Completion Date:
November 2013

CONSTRUCT PARKING LOT CATM

,

Construction of a new parking lot to replace a dirt lot that was unstable during rain events, and caused erosion and instability. The project consisted of construction of a new parking lot and accompanying drainage system.

Owner & Location:
United Sates Air Force Academy | Colorado Springs, CO

Project Completion Date:
November 2013

REPAIR PARKING LOTS 1130 AND 1230

,

The Repair Parking Lots 1130 and 1230 project at Fort Carson consisted of demolition of existing pavement, and re-paving parking lots for Buildings 1130 and 1230. Work included demolition of exisitng lots, asphalt mill and overlay, demolition and replacement of damaged curb and gutter, demolition and replacement of damaged side-walks, installation of handicap ramp, installation of pavement markings and haul away of all debris generated by the project.

Owner & Location:
Fort Carson, Joint Forces Paving MATOC | Fort Carson, CO

Project Completion Date:
October 2013

WELTON STREET GARAGE ROOF REPLACEMENT

,

Replacement of existing 45,000 sq foot roof with a high performance 30 year warranty roof system.

Owner & Location:
General Services Administration | Denver Federal Center, Lakewood, CO

Project Completion Date:
May 2013