Industries

ADA COMPLIANCE REPAIRS (8 Schools)

,

ADA Compliance repairs to 8 Denver Public Schools. Scopes of work included relocating bathroom accessories, installing ADA toilets, replacing bathroom partition walls, and expanding doorway entrances.

Project Completion
January 2017

GODSMAN HOOD KITCHEN REPLACEMENT

,

Replacement of kitchen hood and upgraded fire suppression system

Project Completion
August 20187

SOUTHEAST RAIL LINE EXTENSION

,

Lone Tree | Ridgegate | Skyridge

The Southeast Rail Line Extension is part of a multi-billion dollar, transit expansion. Sky Blue Builders performed work on three stations as part of a Design-Build project to construct 2.3 mile-long Light Rail corridor. Sky Blue Builders work included constructing station platforms, sidewalk concrete, station plaza, curbs and asphalt paving.

Owner & Location:
RTD/Balfour Beatty | Aurora, CO

Project Completion Date:
April 2018

RTD ON-CALL CONSTRUCTION SERVICES

,

This 4-year, $10 Million Contract consists of infrastructure & civil/site projects which can include earthwork, utilities, storm sewer systems, erosion control, retaining walls, asphalt paving, concrete, curb & gutter, lighting, signing and striping, landscaping, fencing, etc. In total, 25 projects were completed under this contract.

Owner & Location:
Regional Transportation District | Denver , CO

Contract Completion Date:
September 2017

CCD ENHANCED BICYCLE FACILITY CONSTRUCTION SERVICES ON-CALL

This $5.4 Million, 3-year contract consisted of a variety of scopes of work, including demolition, landscape restoration, concrete pavement, curb inlets, reinforced concrete pipe, concrete sidewalk and ramps, curb & gutter, signage, site furnishings, irrigation, pavement markings and survey

Contract Completion

September 2019

I-225 LIGHT RAIL LINE (6 STATIONS)

,

Iliff Station | 13th Avenue Station | Colfax Station | City Center Station | Fitzsimmons Station | Peoria Station

The I-225 Rail Line Project is part of a multi-billion dollar, transit expansion. Sky Blue Builders performed work on six stations as part of a Design-Build project to construct 10.5 miles of Light Rail corridor. Sky Blue Builders work included constructing station platforms with scopes of work including:
• Earthwork
• Concrete
• Rebar
• Plumbing
• Masonry

Owner & Location:
RTD/Kiewit | Aurora, CO

Project Completion Date:
2015

KAISER REGION WIDE SECURITY CAMERA UPGRADES

,

Replacement of approximately 388 analog security cameras in specified Kaiser medical facilities/pharmacies in the Colorado Region with digital security cameras, as well as, add 272 digital cameras to deficient areas identified by security.
Total installation includes 660 digital security cameras installed and connected to the Kaiser Permanente Lenel security system. Project scope also includes patch and paint of walls and ceilings where cameras were relocated.

Owner & Location:
Kaiser Permanente | Various Locations throughout Colorado

Project Completion Date:
May 2015

Jewel Cave Repair Parking Lot & Drainage System

,

This project for the National Park Service includes construction of a new parking lot for visitors of the Jewel Cave Monument in South Dakota. Work consists of a new drainage system to keep water from continuing to drain into the cave structure. Also included in the scope of work is a new 200 SF kiosk at the entry of the Monument.

Owner & Location:
National Park Service | Jewel Cave National Monument, South Dakota

Project Completion Date:
January 2015

NIST CUP COMPRESSOR

, , ,

Relocation and expansion of Central Utility Plant to accommodate 2 new compressor in order to add redundancy to existing system.

Owner & Location:
National Institute of Standards & Technology | Boulder, CO

Project Completion Date:
March 2013

NIST SERVER ROOM

, , ,

Conversion of existing office space to accommodate new Server Room. Project entailed relocating existing generator, entire HVAC upgrade, fire suppression system addition, upgrade to electrical system and installation of new power system racks.

Owner & Location:
National Institute of Standards & Technology | Boulder, CO

Project Completion Date:
March 2013

GSA 22ND & STOUT PARKING LOT REPAVING

,

This design-build project consists  the re-paving of a asphalt parking lot and replacement of perimeter chain-link. Scope of works consisted of demolition, asphalt, pavement markings, signage and fencing.

Owner & Location:
General Services Administration | Downtown Denver, CO

Project Completion Date:
October 2017

PARKER HOMESTEAD

,

Site Development of a 116 acre Master Planned community for Standard Pacific Homes in Parker, CO. This 4 Phased, 350 Lot development consisted on overlot grading, sub-ex, off-site and on-site water and sewer, landscaping, paving, asphalt, curb & gutter, major drainage structures and gas and electric.

Owner & Location:
Standard Pacific Homes | Parker, CO

Project Completion Date:
January 2013

DENVER INTERNATIONAL AIRPORT – CAISSONS / PLACE & FINISH

,

As a strategic partner to the Mortenson-Hunt-Saunders (MHS) Tri-Venture for the DIA Public Transit Center & Hotel, this $350 Million project consists of a 500-room Westin Hotel and Conference Center, light rail station, terminal interface, east & west podiums and passenger plaza.

Sky Blue Builders scopes include:

  • 554 Caissons
  • 6 floors of place and finish concrete
  • Sidewalks and signage
  • Foundations excavation and b

Owner & Location:
Denver International Airport | Denver, CO

Project Completion Date:
January 2013 (estimated)

WILDGRASS FILING | PHASE 5

,

Site development of the Wildgrass Townhomes Subdivision which entailed an extensive trail system (crusher fines and concrete) and meandering sidewalks, parking areas, alleyways, ditches, retaining walls, landscaping and dry
utilities. Required extensive coordination with the City & County of Broomfield, Standard Pacific Homes, Wildgrass HOA and various agencies to ensure that each phase was developed according to the time-sensitive schedule. Phased
development of the site allowed for the homebuilder to sequentially takedown and developed finished lots in a reasonable, cost-effective manner.

Owner & Location:
Standard Pacific Homes | Broomfield, CO

Project Completion Date:
July 2012

FDA INVESTIGATIONS AREA

, , ,

Demolition and build-out of approximately 12,000 square feet of existing office space for the Food and Drug Administration in Building 20.

Owner & Location:
General Services Administration | Denver Federal Center, Lakewood, CO

Project Completion Date:
January 2012

ANTENNA PLATFORM PROJECT

,

Construction of structural concrete pad and corresponding piers to host secure antenna for GSA. Installation of conduit and electrical from Antenna to USFS Warehouse.

Owner & Location:
General Services Administration | Denver Federal Center, Lakewood, CO

Project Completion Date:
November 2011

BERKELEY & VANDERBILT NEW RESTROOM BUILDINGS

,

Work consists of a new restroom building with cast-in-place concrete, unit masonry, dimensional lumber framing, asphalt shingle roofing, joint sealants, steel doors and frames, interior finishes, HVAC systems, plumbing fixtures, electrical systems, photovoltaic panels.

Owner & Location:
City & County of Denver | Denver, CO

Project Completion Date:
September 2011

ENTERPRISE RENT-A-CAR

,

On-Call Services Include: General Repair & Maintenance, Wash Bay Repair, Install & Repair Oil / Sand Traps, Drainage, Electrical & Lighting, Kitchen Remodel, Painting, Fire Alarm System Upgrade, HVAC, Lobby Upgrade & Renovation, Roof Replacement, Landscape Maintenance, Fence Install & Maintenance, Restroom Remodel, Parking Lot Maintenance.

Owner & Location:
Enterprise Rent-a-Car | Northern & Southern, CO

Project Completion Date:
May 2011