Joint Forces Paving MATOC

JOINT FORCES PAVING MATOC

,

IDIQ Contract to provide paving related activities and structure including roadways, bridges, sidewalks, parking areas, ditches trails and airfields at Fort Carson Army Installation, Pinion Canyon Maneuver Site, Pueblo Chemical Depot, United States Air Force Academy, Cheyenne Mountain Air Station, Peterson, Buckley, and Schriever Air Force Bases along the Colorado Front Range.

Owner & Location:
Front Range Military Installations | Colorado Springs & Denver, CO

Project Completion Date:
June 2015

REPAIR PARKING LOTS 1130 AND 1230

,

The Repair Parking Lots 1130 and 1230 project at Fort Carson consisted of demolition of existing pavement, and re-paving parking lots for Buildings 1130 and 1230. Work included demolition of exisitng lots, asphalt mill and overlay, demolition and replacement of damaged curb and gutter, demolition and replacement of damaged side-walks, installation of handicap ramp, installation of pavement markings and haul away of all debris generated by the project.

Owner & Location:
Fort Carson, Joint Forces Paving MATOC | Fort Carson, CO

Project Completion Date:
October 2013

KFC PARKING LOT

,

Removal and replacement of 5,000 square yard asphalt parking lot which included curb & gutter, signage and sidewalk.

Owner & Location:
Fort Carson Army Installation | Colorado Springs, CO

Project Completion Date:
January 2013

REPAIR STEWART STREET

,

Installation of a left turn lane on Stewart Street which required the demolition of existing landscaped median, installation of curb & gutter, asphalt, striping, signage and relocation of light pole within the restored landscaped median.

Owner & Location:
Peterson AFB | Colorado Springs, CO

Project Completion Date:
January 2012