United Airlines Station Operations Center

“We’re proud to support United’s ongoing investment in Denver with a facility designed to meet the demands of round-the-clock airline operations.”Mowa Haile, President, Sky Blue Builders
The United Airlines Station Operations Center modernization program focused on expanding operational capacity, …
Equinix Data Center – Door Removal & Infill

Sky Blue Builders completed a small-scope exterior modification at the Equinix data center in Englewood, Colorado, supporting ongoing upgrades within an active, mission-critical facility. The work involved the removal of an existing exterior door and infill of the opening with …
Central Plant Boiler 6 Replacement (CPLT)

The CPLT Boiler 6 Replacement project at Denver International Airport involved the removal and replacement of a mission-critical boiler system serving the airport’s central heating and domestic hot water infrastructure.
The scope included installation of a new boiler, fuel oil …
Consolidated Space Operations – Entry Control Point (ECP) Facility

Sky Blue Builders served as a prime subcontractor under Hensel Phelps for the ground-up construction of a new Entry Control Point (ECP) facility at Schriever Space Force Base. This project was a critical component of Hensel Phelps’ larger $122 million …
Deployable Structures Laboratory

Sky Blue Builders served as the prime contractor for the design-build delivery of the Deployable Structures Laboratory for the Air Force Research Laboratory at Kirtland Air Force Base. The approximately 4,300-square-foot facility was purpose-built to support the testing and evaluation of deployable …
NIST Central Utility Plant (CUP) Compressor Upgrade

This project involved a large-scale mechanical upgrade to the Central Utility Plant serving the National Institute of Standards and Technology (NIST), driven by increased system demand associated with the addition of the new PML building. The scope included the installation …
NIST Server Room Relocation

This project involved the renovation and conversion of existing laboratory and office space at the National Institute of Standards and Technology (NIST) in Boulder, Colorado, to create a new, fully compliant server room supporting mission-critical operations. The scope included construction …