Federal

ROCKY MOUNTAIN ARSENAL EMERGENCY ROAD AND ROOF REPAIR

,

This project for the U.S. Fish & Wildlife Service at the Rocky Mountain Arsenal National Wildlife Refuge included road, drainage and roof repairs. This emergency work was needed to repair damage that was caused by flooding that occurred during the week of September 8, 2013.

Owner & Location:
U.S. Fish & Wildlife Service | Rocky Mountain Arsenal National Wildlife Refuge, CO

Project Completion Date:
November 2013

CONSTRUCT PARKING LOT CATM

,

Construction of a new parking lot to replace a dirt lot that was unstable during rain events, and caused erosion and instability. The project consisted of construction of a new parking lot and accompanying drainage system.

Owner & Location:
United Sates Air Force Academy | Colorado Springs, CO

Project Completion Date:
November 2013

REPAIR PARKING LOTS 1130 AND 1230

,

The Repair Parking Lots 1130 and 1230 project at Fort Carson consisted of demolition of existing pavement, and re-paving parking lots for Buildings 1130 and 1230. Work included demolition of exisitng lots, asphalt mill and overlay, demolition and replacement of damaged curb and gutter, demolition and replacement of damaged side-walks, installation of handicap ramp, installation of pavement markings and haul away of all debris generated by the project.

Owner & Location:
Fort Carson, Joint Forces Paving MATOC | Fort Carson, CO

Project Completion Date:
October 2013

WELTON STREET GARAGE ROOF REPLACEMENT

,

Replacement of existing 45,000 sq foot roof with a high performance 30 year warranty roof system.

Owner & Location:
General Services Administration | Denver Federal Center, Lakewood, CO

Project Completion Date:
May 2013

NIST CUP COMPRESSOR

, , ,

Relocation and expansion of Central Utility Plant to accommodate 2 new compressor in order to add redundancy to existing system.

Owner & Location:
National Institute of Standards & Technology | Boulder, CO

Project Completion Date:
March 2013

NIST SERVER ROOM

, , ,

Conversion of existing office space to accommodate new Server Room. Project entailed relocating existing generator, entire HVAC upgrade, fire suppression system addition, upgrade to electrical system and installation of new power system racks.

Owner & Location:
National Institute of Standards & Technology | Boulder, CO

Project Completion Date:
March 2013

KFC PARKING LOT

,

Removal and replacement of 5,000 square yard asphalt parking lot which included curb & gutter, signage and sidewalk.

Owner & Location:
Fort Carson Army Installation | Colorado Springs, CO

Project Completion Date:
January 2013

VA PLAYGROUND

,

Renovation and remodel of existing playground located at Veterans Affair Administration Building. ADA complaint and safety design features consisted of installation of new sidewalks, new astro turf, new landscaping, resilient safety surface and new playground equipment.

Owner & Location:
General Services Administration | VA Administration Building Denver Federal Center, CO

Project Completion Date:
September 2012

TRANSFORMER FLUID REPLACEMENT F3

,

Removal, proper disposal, and replacement of over 4,300 gallons of existing transformer fluid with FR3 transformer fluid.

Owner & Location:
Schriever AFB | Colorado Springs, CO

Project Completion Date:
February 2012

REPAIR STEWART STREET

,

Installation of a left turn lane on Stewart Street which required the demolition of existing landscaped median, installation of curb & gutter, asphalt, striping, signage and relocation of light pole within the restored landscaped median.

Owner & Location:
Peterson AFB | Colorado Springs, CO

Project Completion Date:
January 2012

FDA INVESTIGATIONS AREA

, , ,

Demolition and build-out of approximately 12,000 square feet of existing office space for the Food and Drug Administration in Building 20.

Owner & Location:
General Services Administration | Denver Federal Center, Lakewood, CO

Project Completion Date:
January 2012

FISH & WILDLIFE WATERLINE AND DECHLORINATION FACILITY

,

Installation of approximately 14,000 linear feet of pressurized waterline and associated dechlorination building. The pipeline carries non-potable water from Denver Water mainline to two discharge locations; northwest corner of Lower Derby Lake and existing refuge irrigation system in the Rocky Mountain Arsenal.

Owner & Location:
Fish & Wildlife Services | Rocky Mountain Arsenal, Commerce City, CO

Project Completion Date:
January 2012

EROSION CONTROL

,

Installation of Erosion Control Parameters

Owner & Location:
United Sates Air Force Academy | Colorado Springs, CO

Project Completion Date:
November 2010

MEN’S LOCKER ROOM

,

Demolition and remodel of Med Surgical locker room at US Air Force Academy.

Owner & Location:
United Sates Air Force Academy | Colorado Springs, CO

Project Completion Date:
November 2010

BLEACHER INSTALL

,

Demolition and Install of Air Force Academy bleachers.

Owner & Location:
United Sates Air Force Academy | Colorado Springs, CO

Project Completion Date:
May 2010