Industries

ENTERPRISE RENT-A-CAR

,

On-Call Services Include: General Repair & Maintenance, Wash Bay Repair, Install & Repair Oil / Sand Traps, Drainage, Electrical & Lighting, Kitchen Remodel, Painting, Fire Alarm System Upgrade, HVAC, Lobby Upgrade & Renovation, Roof Replacement, Landscape Maintenance, Fence Install & Maintenance, Restroom Remodel, Parking Lot Maintenance.

Owner & Location:
Enterprise Rent-a-Car | Northern & Southern, CO

Project Completion Date:
May 2011

GRAINGER BRANCH REMODEL – Farmington, NM

,

Branch Remodel consisted of the renovation of break room, general office, sales floor and men’s/women’s restroom. Office equipment, furniture and merchandise was disassembled and reassembled based upon new layout plans.

Owner & Location:
W.W. Grainger, Inc. | Farmington, New Mexico

Project Completion Date:
November 2010

PARK AVENUE IRRIGATION REPLACEMENT

,

Replacement of an existing irrigation system, including but not limited to: Sidewalk repair / replacement, traffic control, utility verification, irrigation mainline, excavation, backfill and compaction, controller with extension of new high voltage feed and fiber optic communication connection, and landscape restoration including fine grade, seed and sod installation.

Owner & Location:
City & County of Denver | Denver, CO

Project Completion Date:
October 2010

GRAINGER BRANCH REMODEL

,

Grainger, Boise, ID
Renovation of Men/Women’s restroom, break room, and general office. Exterior work consisted of partial concrete, paint and fencing.

Owner & Location:
W.W. Grainger, Inc. | Boise, ID

Project Completion Date:
October 2010

CDOT Concrete Slope & Ditch Paving

,

Replacement of an existing 30,000 sq ft asphalt parking lot. Scope of work consisted of an 5,500 sq ft concrete extension, utility verification, excavation, backfill and compaction, survey, striping and material testing.

Owner & Location:
Colorado Department of Transportation / GC – LaFarge | Greeley, CO

Project Completion Date:
August 2010

INTEGRATED PRINTING SOLUTIONS OFFICE SPACE REMODEL

,

Office remodel consisting of renovation of 2 bathrooms, kitchen, upgrades in lighting and HVAC.

Owner & Location:
Integrated Printing Solutions | Centennial, CO

Project Completion Date:
May 2010

PARKING LOT RENOVATION Grainger – Casper, WY

, ,

Replacement of an existing 30,000 sq ft asphalt parking lot. Scope of work consisted of an 5,500 sq ft concrete extension, utility verification, excavation, backfill and compaction, survey, striping and material testing.

Owner & Location:
W.W. Grainger, Inc., | Casper, WY

Project Completion Date:
May 2010

LOWRY TWINHOMES

,

Lowry Twinhomes, located in the Lowry Redevelopment Area, consisted of 24 Townhome units developed in two phases. The site development oversight consisted over-excavation, erosion control, wet utilities including water and sewer, dry utilities, curb & gutter, streets, sidewalks, landscaping and rock walls.

Owner & Location:
Standard Pacific Homes | Denver, CO

Project Completion Date:
November 2010

PIONEER INVESTMENT OFFICE REMODEL

,

Renovation of a 16,000 square foot office space which required complete demo of existing office, frame & drywall install paint, electrical, plumbing and HVAC. The new space included 30 office units, break room/kitchen, two reception areas, two restrooms and three conference rooms, and a large boardroom.

Owner & Location:
Pioneer Investments | Lakewood, CO

Project Completion Date:
November 2009