Sky Blue
Infrastructure Projects
Infrastructure Projects
JOINT FORCES PAVING MATOC
Federal, Joint Forces Paving MATOC
250 Million / 7 Year IDIQ Contract to provide paving related activities and structure including roadways, bridges, sidewalks, parking areas, ditches trails and airfields at Fort Carson Army Installation, Pinion Canyon Maneuver Site, Pueblo Chemical Depot, United States Air Force Academy, Cheyenne Mountain Air Station, Peterson, Buckley, and Schriever Air Force Bases along the Colorado Front Range.
Owner & Location:
Front Range Military Installations | Colorado Springs & Denver, CO
Contract Completion Date:
June 2027
SOUTHEAST RAIL LINE EXTENSION
Industries, Transit
Lone Tree | Ridgegate | Skyridge
The Southeast Rail Line Extension is part of a multi-billion dollar, transit expansion. Sky Blue Builders performed work on three stations as part of a Design-Build project to construct 2.3 mile-long Light Rail corridor. Sky Blue Builders work included constructing station platforms, sidewalk concrete, station plaza, curbs and asphalt paving.
Owner & Location:
RTD/Balfour Beatty | Aurora, CO
Project Completion Date:
April 2018
REPAIR HARDSTAND, BUILDING 2492
Federal, US Army Corps of Engineers
Facilities, Sustainment, Restoration, and Modernization (FSRM) Project which consists of exterior pavement repair work and repaving of the hardstand at Building 2492 at the Fort Carson Military Installation.
Owner & Location:
U.S. Army Corps of Engineers, Omaha District | Colorado Springs, Colorado
Project Completion
July 2018
RTD ON-CALL CONSTRUCTION SERVICES
Industries, Infrastructure
This 4-year, $10 Million Contract consists of infrastructure & civil/site projects which can include earthwork, utilities, storm sewer systems, erosion control, retaining walls, asphalt paving, concrete, curb & gutter, lighting, signing and striping, landscaping, fencing, etc. In total, 25 projects were completed under this contract.
Owner & Location:
Regional Transportation District | Denver , CO
Contract Completion Date:
September 2017
I-225 LIGHT RAIL LINE (6 STATIONS)
Industries, Transit
Iliff Station | 13th Avenue Station | Colfax Station | City Center Station | Fitzsimmons Station | Peoria Station
The I-225 Rail Line Project is part of a multi-billion dollar, transit expansion. Sky Blue Builders performed work on six stations as part of a Design-Build project to construct 10.5 miles of Light Rail corridor. Sky Blue Builders work included constructing station platforms with scopes of work including:
• Earthwork
• Concrete
• Rebar
• Plumbing
• Masonry
Owner & Location:
RTD/Kiewit | Aurora, CO
Project Completion Date: