Center-running and side-running BRT stations are being constructed along East Colfax Avenue as part of one of Denver’s most significant transit infrastructure investments.
Multiple on-call contracts support municipal mobility, safety, and facilities improvements through responsive civil and vertical construction services across Denver.
Multiple fast-tracked concession build-outs were completed within active airport concourses while maintaining strict operational and security requirements.
A mission-critical electrical switchgear replacement is advancing essential infrastructure upgrades while maintaining uninterrupted operations at the Food Bank of the Rockies.
Time-sensitive construction and facilities work supported airside and landside operations through multiple on-call contracts at Denver International Airport.
Multiple federal task orders delivered tenant renovations, building upgrades, and infrastructure improvements across the General Services Administration Region 8 footprint.
A first-of-its-kind aviation workforce development and research facility was completed at Denver International Airport to support equity, education, and industry access.
A highly specialized laboratory buildout was completed at NREL’s Energy Systems Integration Facility (ESIF) to support advanced environmental and energy systems research.
A targeted exterior modification was executed within an active Equinix data center, requiring precise coordination in a secure, mission-critical environment.
An airside-adjacent parking expansion was completed within a highly regulated airport environment through intensive coordination and winter construction planning.
A fast-tracked interior renovation was completed within an active behavioral health facility, carefully sequenced to protect patient privacy and staff continuity.
A secure deployable structures laboratory was designed and constructed to support research and testing operations for the Air Force Research Laboratory.
On-call construction services support RTD’s regional transit system through rapid-response execution, multi-discipline coordination, and active-rail logistics.
Parking lot and stormwater infrastructure upgrades improved visitor access while protecting the monument’s fragile cave system through innovative drainage and water treatment solutions.
A ground-up visitor and education center at the Baca National Wildlife Refuge supports public access, environmental education, and stewardship within a sensitive natural landscape.
A regionwide digital security camera upgrade enhanced safety and surveillance across occupied healthcare facilities with minimal disruption to patients and staff.
A 1,200-square-foot LEED Gold, design-assist coffee pavilion constructed on Metro State’s Auraria Campus, featuring a sleek architectural facade and innovative concealed HVAC systems.